"Strive for Perfection And Win by Quality"

We provide following service to all of our customers:
1. PCB production service. Available on FR-4,TG150-180,Aluminum, FPC
2. PCB copy service
3. PCB assembly service. Available on SMT, BGA, DIP.
4. And Box build assemble. Available on Final Functional testing and final package
5. Electronic Component purchasing service
The following information is requested for this service:
*Gerber files of the bare PCB
*Bill of materials to include: Manufacturer's part number, type of part, type of packaging, component locations listed by reference designators and quantity
*Dimensional specifications for non-standard components
*Assembly drawing, including any change notices
*Final test procedures (if available)
Our Advantages:
*Our company was established in 1996, which is engaged in printing circuit board production. It has long history.
*We have our own factory and equipped with advanced circuit board production line. the digital control drilling machine, optical painting equipment, exposing machine, developing machine and so on.
It can produce a high-quality PCB production.
*Enjoying high reputation in this line.
*Effective management to make every member can do their best for the customer.
Company Honor:
In order to meet the importance of global economic development on the market
Our Company have been certificated by
ISO9000,
and Our Products have been certificated by
CE UL, and
ROHS.
Technical Information:
ITEMS | CAPACITY |
Base material | FR4 |
Copper thickness | 0.5-2.0oz |
Board thickness | 0.2-3.0mm |
Min. Hole size | 0.25mm |
Min. Line width | 0.2mm |
Min. Line spacing | 0.2mm |
Surface finishing | immersion gold.OSP.HASL(Spray tin) |
Sold mask | Red.blue.yellow.black.white.etc. |
Test | E-Testing |
Certification | ISO9000,CE,ROHS |
Lead time | For sample:1-7 days |
For opening mould:3-7 days |
For mass production:5-10 days |
Packing | Inner packing: vacuum packing |
Outside packing: Standard carton packing |
Quick Leadtime:
Lead time for sample | 2-3 days for single-sided board |
4-5 days for double-sided board |
6-7 days for multilayer board |
24-48 hours for urgent |
Lead time for Opening Mould | 3-5 days for normal mould |
5-7 days for hard mould |
Lead time for Mass production | |
7-10 days for multilayer board |
Product Show:
*Packing Terms:
(1)Inner packing: all the goods will be packed by vacuum
(2)Outer packing: standard carton

*Shipping:
(1)Import taxes and duty are not included in the price, buyer should pay for it.
(2)Delivery Time: within 3-7 days after receipt of your payment.
*Payment:
1.50% paid in advance by T/T, Western Union or Paypal.
The balance 50% should be paid before shipping.
2.100% of the sales proceeds by T/T before we ship all the goods
*After-Service:
1. All our products have been checked and packaged in good condition.
2. If the items you received is defective, please contact us asap.
We will replace another new one after we check it.