Welcome to visit our Website!
We are Shenzhen K-better Electrical Company,which is engaged in Printing Circuit Board Production.
Our Service:
We provide following service to all of our customers:
1. PCB production service. Available on FR-4,TG150-180,Aluminum, FPC
2. PCB copy service
3. PCB assembly service. Available on SMT, BGA, DIP.
4. And Box build assemble. Available on Final Functional testing and final package
5. Electronic Component purchasing service
The following information is requested for this service:
*Gerber files of the bare PCB
*Bill of materials to include: Manufacturer's part number, type of part, type of packaging, component locations listed by reference designators and quantity
*Dimensional specifications for non-standard components
*Assembly drawing, including any change notices
*Final test procedures (if available)
Company Honor:
In order to meet the importance of global economic development on the market
Our Company have been certificated by
ISO9000,
and Our Products have been certificated by
CE UL, and
ROHS.
Our Superiority
Well and high quality control
Prompt delivery
Small order acceptable
Perfect craft procedure
Customer's designs are welcome
Technical Standard for Double-sided PCB:
ITEMS | CAPACITY |
Base material | FR4 |
Copper thickness | 0.5-2.0oz |
Board thickness | 0.2-3.0mm |
Min. Hole size | 0.25mm |
Min. Line width | 0.2mm |
Min. Line spacing | 0.2mm |
Surface finishing | immersion gold.OSP.HASL(Spray tin) |
Sold mask | Red.blue.yellow.black.white.etc. |
Test | E-Testing |
Certification | ISO9000,CE,ROHS |
Lead time | For sample:1-7 days |
For opening mould:3-7 days |
For mass production:5-10 days |
Packing | Inner packing: vacuum packing |
Outside packing: Standard carton packing |
Product Show:
Quick Leadtime:
Lead time for sample | 2-3 days for single-sided board |
4-5 days for double-sided board |
6-7 days for multilayer board |
24-48 hours for urgent |
Lead time for Opening Mould | 3-5 days for normal mould |
5-7 days for hard mould |
Lead time for Mass production | |
7-10 days for multilayer board |
Welcome to visit our Factory:
If you have any interest in our product
Please contact us at any time.